odoo-manufacturing-advisor — quality + safety report

In the Skillier index (antigravity__odoo-manufacturing-advisor) · scanned 2026-06-03 · engine: builtin+triage

A
Quality
100/100
Safety

✓ Clean — no heuristic safety flags surfaced.

Heuristic flags from the builtin scanner, which is known to over-flag (it trips on legitimate env-reading integrations, security skills, and library .eval calls). This is NOT an authoritative malicious verdict — re-scan with SkillSpector for the authoritative result. Run the authoritative scan →

Skillproof quality grade A

📇 This skill is in the Skillier index (curated · deduped · quality-filtered). Install Skillier to route & load it into your AI client.

Quality notes

No quality issues flagged. ✓

About this skill

Expert guide for Odoo Manufacturing: Bills of Materials BoM , Work Centers, routings, MRP planning, and production order workflows.

📄 Read the SKILL.md
---
name: odoo-manufacturing-advisor
description: "Expert guide for Odoo Manufacturing: Bills of Materials (BoM), Work Centers, routings, MRP planning, and production order workflows."
risk: safe
source: "self"
---

# Odoo Manufacturing Advisor

## Overview

This skill helps you configure and optimize Odoo Manufacturing (MRP). It covers Bills of Materials (BoM), Work Centers, routing operations, production order lifecycle, and Material Requirements Planning (MRP) runs to ensure you never run short of materials.

## When to Use This Skill

- Creating or structuring Bills of Materials for finished goods.
- Setting up Work Centers with capacity and efficiency settings.
- Running an MRP to automatically generate purchase and production orders from demand.
- Troubleshooting production order discrepancies or component availability issues.

## How It Works

1. **Activate**: Mention `@odoo-manufacturing-advisor` and describe your manufacturing scenario.
2. **Configure**: Receive step-by-step instructions for BoM setup, routing, and MRP configuration.
3. **Plan**: Get guidance on running MRP and interpreting procurement messages.

## Examples

### Example 1: Create a Bill of Materials

```text
Menu: Manufacturing → Products → Bills of Materials → New

Product: Finished Widget v2
BoM Type: Manufacture This Product
Quantity: 1 (produce 1 unit per BoM)

Components Tab:
  - Raw Plastic Sheet  | Qty: 0.5  | Unit: kg
  - Steel Bolt M6      | Qty: 4    | Unit: Units
  - Rubber Gasket      | Qty: 1    | Unit: Units

Operations Tab (requires "Work Orders" enabled in MFG Settings):
  - Operation: Injection Molding | Work Center: Press A   | Duration: 30 min
  - Operation: Assembly          | Work Center: Line 1    | Duration: 15 min
```

> **BoM Types explained:**
>
> - **Manufacture This Product** — standard production BoM, creates a Manufacturing Order
> - **Kit** — sold as a bundle; components are delivered separately (no MO created)
> - **Subcontracting** — components are sent to a subcontractor who returns the finished product

### Example 2: Configure a Work Center

```text
Menu: Manufacturing → Configuration → Work Centers → New

Work Center: CNC Machine 1
Working Hours: Standard 40h/week
Time Efficiency: 85%      (machine downtime factored in; 85% = 34 effective hrs/week)
Capacity: 2               (can run 2 production operations simultaneously)
OEE Target: 90%           (Overall Equipment Effectiveness KPI target)
Costs per Hour: $75.00    (used for manufacturing cost reporting)
```

### Example 3: Run the MRP Scheduler

```text
The MRP scheduler runs automatically via a daily cron job.
To trigger it manually:

Menu: Inventory → Operations → Replenishment → Run Scheduler
(or Manufacturing → Planning → Replenishment in some versions)

After running, review procurement exceptions:
Menu: Inventory → Operations → Replenishment

Message Types:
  "Replenish"   — Stock is below minimum; needs a PO or MO
  "Reschedule"  — An order's scheduled date conflicts with demand
  "Cancel"      — Demand no longer exists; the order can be cancelled
```

## Best Practices

- ✅ **Do:** Enable **Work Orders** in Manufacturing Settings to use routing and time-tracking per operation.
- ✅ **Do:** Use **BoM with variants** (via product attributes) for products that come in multiple configurations (color, size, voltage) — avoids duplicate BoMs.
- ✅ **Do:** Set **Lead Times** on components (vendor lead time + security lead time) so MRP schedules purchase orders in advance.
- ✅ **Do:** Use **Scrap Orders** when discarding defective components during production — never adjust stock manually.
- ❌ **Don't:** Manually create purchase orders for MRP-managed items — override MRP suggestions only when justified.
- ❌ **Don't:** Confuse **Kit** BoM with **Manufacture This Product** — a Kit never creates a Manufacturing Order.

## Limitations

- This skill targets **Odoo Manufacturing (mrp)** module. **Maintenance**, **PLM** (Product Lifecycle Management), and **Quality** modules are separate Enterprise modules not covered here.
- **Subcontracting** workflows (sending components to a third-party manufacturer) have additional receipt and valuation steps not fully detailed here.
- **Lot/serial number traceability** in production (tracking which lot was consumed per MO) adds complexity; test with small batches before full rollout.
- MRP calculations assume demand comes from **Sale Orders** and **Reordering Rules** — forecasts from external systems require custom integration.
Scan or optimize your own skill →

Want a live grade + an embeddable README badge? Run your skill through the free scanner.

Graded independently by Skillproof — nothing to sell the author. Quality is mechanical + corpus-grounded; safety flags are heuristic (builtin+triage), not a malicious verdict.